Thailand BCG framework cluster gross output (2027 base case)
~USD 24-36B
Modelled 2027 gross output band combining NatureWorks-PTTGC PLA Nakhon Sawan (75 ktpa, commissioning 2025-2026), EECi Wangchan Valley tenant ramp to 80 percent occupancy, brand-owner offtake commitments, Mitr Phol biomass-to-power and bioethanol expansion, plus the long-tail SME bio-processor cohort. Implies a 1.8-2.8x lift versus 2024.
Figure in context
Modelled 2027 gross output band combining NatureWorks-PTTGC PLA Nakhon Sawan (75 ktpa, commissioning 2025-2026), EECi Wangchan Valley tenant ramp to 80 percent occupancy, brand-owner offtake commitments, Mitr Phol biomass-to-power and bioethanol expansion, plus the long-tail SME bio-processor cohort. Implies a 1.8-2.8x lift versus 2024.
Modelled 2027 gross output band combining NatureWorks-PTTGC PLA Nakhon Sawan (75 ktpa, commissioning 2025-2026), EECi Wangchan Valley tenant ramp to 80 percent occupancy, brand-owner offtake commitments, Mitr Phol biomass-to-power and bioethanol expansion, plus the long-tail SME bio-processor cohort. Implies a 1.8-2.8x lift versus 2024.
Time scope
FY2027 modelled
Source basis
Supporting source
Interpretation notes
What this tells you
Modelled 2027 gross output band combining NatureWorks-PTTGC PLA Nakhon Sawan (75 ktpa, commissioning 2025-2026), EECi Wangchan Valley tenant ramp to 80 percent occupancy, brand-owner offtake commitments, Mitr Phol biomass-to-power and bioethanol expansion, plus the long-tail SME bio-processor cohort. Implies a 1.8-2.8x lift versus 2024.
What not to do with it
Use the linked report for interpretation and keep basis differences explicit.
Related figures
Adjacent numbers that add context without drowning the value.
Thailand BCG framework cluster gross output (2024 baseline)
NXPO BCG progress brief, operator disclosures
Brand-owner Thai-sourced PLA, bio-PE, bio-PET offtake (2027 band)
Coca-Cola, Unilever, Nestle, PepsiCo press releases
NatureWorks-PTTGC Nakhon Sawan PLA plant nameplate capacity
NatureWorks press release, PTTGC factsheet
EECi Wangchan Valley biorefinery cluster 2027 occupancy target
NSTDA EECi Wangchan Valley page
BOI Section 8 BCG Economy bonus additional tax holiday
BOI BCG Economy measures page
T-VER carbon-credit stacking IRR uplift on Thai bioenergy projects
Thailand Greenhouse Gas Management Organization T-VER methodology, operator project economics
Report context
Atlas actors in this figure's reports
Profiles covered in the report that cite this number.