Reference
·Supporting source
Top-5 operator share of 2027 Thai modular construction value (base case)
~70%+
Modelled 2027 share of operating modular and prefab construction value captured by SCG (Mega-Build, SCG Living), Italian-Thai Development (ITD), CH. Karnchang (CK), Sino-Thai Engineering (STEC), and Singapore PPVC subsidiaries (Frasers, CapitaLand, Keppel Land). Mid-tier modular workshop contractors take the long tail.
Figure in context
Modelled 2027 share of operating modular and prefab construction value captured by SCG (Mega-Build, SCG Living), Italian-Thai Development (ITD), CH. Karnchang (CK), Sino-Thai Engineering (STEC), and Singapore PPVC subsidiaries (Frasers, CapitaLand, Keppel Land). Mid-tier modular workshop contractors take the long tail.
Modelled 2027 share of operating modular and prefab construction value captured by SCG (Mega-Build, SCG Living), Italian-Thai Development (ITD), CH. Karnchang (CK), Sino-Thai Engineering (STEC), and Singapore PPVC subsidiaries (Frasers, CapitaLand, Keppel Land). Mid-tier modular workshop contractors take the long tail.
Time scope
FY2027 modelled
Source basis
Supporting source
Interpretation notes
What this tells you
Modelled 2027 share of operating modular and prefab construction value captured by SCG (Mega-Build, SCG Living), Italian-Thai Development (ITD), CH. Karnchang (CK), Sino-Thai Engineering (STEC), and Singapore PPVC subsidiaries (Frasers, CapitaLand, Keppel Land). Mid-tier modular workshop contractors take the long tail.
What not to do with it
Use the linked report for interpretation and keep basis differences explicit.
Related figures
Adjacent numbers that add context without drowning the value.
Thailand modular and prefab construction market value (2024 baseline)
SCG, ITD, CH. Karnchang, Sino-Thai 56-1; TCA; SCB EIC
Thailand modular and prefab construction market value (2027 base case)
Operator factory capacity disclosures, BOI Section 8 queue, MRTA procurement, developer Q1 2026 pilot updates
Myanmar plus Cambodian construction labour exit (2025-2027)
ILO Thailand; Thai Contractors Association; SCB EIC labour reports
SCG Living plus ITD Modular combined factory capacity (2026 target)
SCG, ITD Modular disclosures
Modular construction on-site labour saving versus traditional build
SCG Living, ITD Modular pricing; developer pilot disclosures; BCA Singapore PPVC benchmarks
Modular construction schedule compression
SCG Living, ITD Modular pricing; AWS Bangkok phase 2 procurement; EV cluster gigafactory disclosures
Report context
Atlas actors in this figure's reports
Profiles covered in the report that cite this number.