Solar Carport Project IRR With T-VER Carbon Stacking (2027E)

~14-19% IRR with T-VER

As of2027EΒ·Sources3Β·Supporting

Project IRRs for solar carport plus BESS plus EV charging configurations are projected at 12-16% pre-carbon and 14-19% post T-VER carbon credit stacking. The 200-300 basis point uplift from T-VER credits assumes a BCRC clearing price of THB 180-260 per tonne CO2e through 2027, in line with TGO PL-2/2568 methodology.

Figure in context

Project IRRs for solar carport plus BESS plus EV charging configurations are projected at 12-16% pre-carbon and 14-19% post T-VER carbon credit stacking. The 200-300 basis point uplift from T-VER credits assumes a BCRC clearing price of THB 180-260 per tonne CO2e through 2027, in line with TGO PL-2/2568 methodology.

Project IRRs for solar carport plus BESS plus EV charging configurations are projected at 12-16% pre-carbon and 14-19% post T-VER carbon credit stacking. The 200-300 basis point uplift from T-VER credits assumes a BCRC clearing price of THB 180-260 per tonne CO2e through 2027, in line with TGO PL-2/2568 methodology.

Time scope

2027E

Source basis

Supporting source

Interpretation notes

What this tells you

Project IRRs for solar carport plus BESS plus EV charging configurations are projected at 12-16% pre-carbon and 14-19% post T-VER carbon credit stacking. The 200-300 basis point uplift from T-VER credits assumes a BCRC clearing price of THB 180-260 per tonne CO2e through 2027, in line with TGO PL-2/2568 methodology.

What not to do with it

Use the linked report for interpretation and keep basis differences explicit.

Related figures

Adjacent numbers that add context without drowning the value.

Report context

Atlas actors in this figure's reports