Reference

·

Primary source

EEC infrastructure investment cycle value (2018-2027)

~THB 1.7T programme

As of2018-2027 programme value·Sources3·Primary

The Eastern Economic Corridor (EEC) infrastructure investment programme spans 2018-2027 with a headline value of approximately THB 1.7 trillion (~USD 47B) per EECO (Eastern Economic Corridor Office) disclosures, anchored on five flagship projects: U-Tapao Airport and Eastern Aviation City (~THB 290B), High-Speed Rail Linking Three Airports (~THB 224B, AERA-1 consortium-led), Map Ta Phut Phase 3 deep-sea port (~THB 56B), Laem Chabang Phase 3 (~THB 110B), and the EEC Smart City and digital infrastructure programme. Industrial-estate land sales, factory commissions, and EV-related foreign direct investment under BOI EV3.5 are the parallel demand layer driving sustained engineering and architecture services revenue through 2027.

Figure in context

The Eastern Economic Corridor (EEC) infrastructure investment programme spans 2018-2027 with a headline value of approximately THB 1.7 trillion (~USD 47B) per EECO (Eastern Economic Corridor Office) disclosures, anchored on five flagship projects: U-Tapao Airport and Eastern Aviation City (~THB 290B), High-Speed Rail Linking Three Airports (~THB 224B, AERA-1 consortium-led), Map Ta Phut Phase 3 deep-sea port (~THB 56B), Laem Chabang Phase 3 (~THB 110B), and the EEC Smart City and digital infrastructure programme. Industrial-estate land sales, factory commissions, and EV-related foreign direct investment under BOI EV3.5 are the parallel demand layer driving sustained engineering and architecture services revenue through 2027.

The Eastern Economic Corridor (EEC) infrastructure investment programme spans 2018-2027 with a headline value of approximately THB 1.7 trillion (~USD 47B) per EECO (Eastern Economic Corridor Office) disclosures, anchored on five flagship projects: U-Tapao Airport and Eastern Aviation City (~THB 290B), High-Speed Rail Linking Three Airports (~THB 224B, AERA-1 consortium-led), Map Ta Phut Phase 3 deep-sea port (~THB 56B), Laem Chabang Phase 3 (~THB 110B), and the EEC Smart City and digital infrastructure programme. Industrial-estate land sales, factory commissions, and EV-related foreign direct investment under BOI EV3.5 are the parallel demand layer driving sustained engineering and architecture services revenue through 2027.

Time scope

2018-2027 programme value

Source basis

Primary source

Interpretation notes

What this tells you

The Eastern Economic Corridor (EEC) infrastructure investment programme spans 2018-2027 with a headline value of approximately THB 1.7 trillion (~USD 47B) per EECO (Eastern Economic Corridor Office) disclosures, anchored on five flagship projects: U-Tapao Airport and Eastern Aviation City (~THB 290B), High-Speed Rail Linking Three Airports (~THB 224B, AERA-1 consortium-led), Map Ta Phut Phase 3 deep-sea port (~THB 56B), Laem Chabang Phase 3 (~THB 110B), and the EEC Smart City and digital infrastructure programme. Industrial-estate land sales, factory commissions, and EV-related foreign direct investment under BOI EV3.5 are the parallel demand layer driving sustained engineering and architecture services revenue through 2027.

What not to do with it

Use the linked report for interpretation and keep basis differences explicit.

Related figures

Adjacent numbers that add context without drowning the value.

Report context

Atlas actors in this figure's reports

Profiles covered in the report that cite this number.

EEC infrastructure investment cycle value (2018-2027) · Insight