Thailand top EPC contractor backlog (2024)

ITD ~THB 240B

As of2024 year-end backlog (SET filings)·Sources2·Primary·Historical series (4 points)

Italian-Thai Development PLC (ITD) leads Thailand's tier-1 EPC contractor universe with an estimated THB 230-250 billion 2024 year-end backlog, followed by CH. Karnchang PCL (SET:CK) at THB 160-180B (heavy in hydropower and Bangkok mass transit), STECON Engineering PLC (SET:STEC, formerly Sino-Thai) at THB 90-110B, and Unique Engineering and Construction PCL (SET:UNIQ) at THB 35-45B. The big-4 cumulative backlog of ~THB 550B represents 3.5-4.5 years of revenue cover and is concentrated in Bangkok MRT lines (Orange, Pink, Yellow, Purple extensions), expressway segments, BMA flood works, and the EEC industrial buildout.

Figure in context

Italian-Thai Development PLC (ITD) leads Thailand's tier-1 EPC contractor universe with an estimated THB 230-250 billion 2024 year-end backlog, followed by CH. Karnchang PCL (SET:CK) at THB 160-180B (heavy in hydropower and Bangkok mass transit), STECON Engineering PLC (SET:STEC, formerly Sino-Thai) at THB 90-110B, and Unique Engineering and Construction PCL (SET:UNIQ) at THB 35-45B. The big-4 cumulative backlog of ~THB 550B represents 3.5-4.5 years of revenue cover and is concentrated in Bangkok MRT lines (Orange, Pink, Yellow, Purple extensions), expressway segments, BMA flood works, and the EEC industrial buildout.

ITD (Italian-Thai Deve…ITD (Italian-Thai Development)240CK (CH. Karnchang)170STECON (Sino-Thai)100UNIQ (Unique Engineeri…UNIQ (Unique Engineering)40
Interpretation notes

What this tells you

Italian-Thai Development PLC (ITD) leads Thailand's tier-1 EPC contractor universe with an estimated THB 230-250 billion 2024 year-end backlog, followed by CH. Karnchang PCL (SET:CK) at THB 160-180B (heavy in hydropower and Bangkok mass transit), STECON Engineering PLC (SET:STEC, formerly Sino-Thai) at THB 90-110B, and Unique Engineering and Construction PCL (SET:UNIQ) at THB 35-45B. The big-4 cumulative backlog of ~THB 550B represents 3.5-4.5 years of revenue cover and is concentrated in Bangkok MRT lines (Orange, Pink, Yellow, Purple extensions), expressway segments, BMA flood works, and the EEC industrial buildout.

What not to do with it

Values in THB billion. Backlog ranges per latest 56-1 One Reports; figures fluctuate quarter to quarter on new contract awards and project progress recognition.

Related figures

Adjacent numbers that add context without drowning the value.

Report context

Atlas actors in this figure's reports

Profiles covered in the report that cite this number.

Thailand top EPC contractor backlog (2024) · Insight