Reference
Β·Supporting source
Per-0.1 PUE TCO saving
~6-8%
Each 0.1 PUE improvement cuts data-center total cost of ownership by approximately 6-8% at scale β the core economic driver behind liquid cooling, higher supply-water temperature, free-cooling hybrid investment in Thailand.
Figure in context
Each 0.1 PUE improvement cuts data-center total cost of ownership by approximately 6-8% at scale β the core economic driver behind liquid cooling, higher supply-water temperature, free-cooling hybrid investment in Thailand.
Each 0.1 PUE improvement cuts data-center total cost of ownership by approximately 6-8% at scale β the core economic driver behind liquid cooling, higher supply-water temperature, free-cooling hybrid investment in Thailand.
Time scope
FY2024
Source basis
Supporting source
Interpretation notes
What this tells you
Each 0.1 PUE improvement cuts data-center total cost of ownership by approximately 6-8% at scale β the core economic driver behind liquid cooling, higher supply-water temperature, free-cooling hybrid investment in Thailand.
What not to do with it
Use the linked report for interpretation and keep basis differences explicit.
Related figures
Adjacent numbers that add context without drowning the value.
AWS Bangkok region investment
AWS Bangkok region announcement
Incremental data-center demand by 2030
PDP 2024, EPPO, EGAT
AI/HPC per-rack power density
Uptime Institute, DCD, Structure Research
Thai data-center PUE benchmark
Uptime Institute, DCD benchmarks
Bangkok data-centre capacity
Cushman & Wakefield APAC DC, Data Center Map Thailand
Hyperscale announced Thailand investment
AWS, Google Cloud, Microsoft Azure announcements
Report context
Atlas actors in this figure's reports
Profiles covered in the report that cite this number.