Reference

Β·

Supporting source

Per-0.1 PUE TCO saving

~6-8%

As ofFY2024Β·Sources2Β·Supporting

Each 0.1 PUE improvement cuts data-center total cost of ownership by approximately 6-8% at scale β€” the core economic driver behind liquid cooling, higher supply-water temperature, free-cooling hybrid investment in Thailand.

Figure in context

Each 0.1 PUE improvement cuts data-center total cost of ownership by approximately 6-8% at scale β€” the core economic driver behind liquid cooling, higher supply-water temperature, free-cooling hybrid investment in Thailand.

Each 0.1 PUE improvement cuts data-center total cost of ownership by approximately 6-8% at scale β€” the core economic driver behind liquid cooling, higher supply-water temperature, free-cooling hybrid investment in Thailand.

Time scope

FY2024

Source basis

Supporting source

Interpretation notes

What this tells you

Each 0.1 PUE improvement cuts data-center total cost of ownership by approximately 6-8% at scale β€” the core economic driver behind liquid cooling, higher supply-water temperature, free-cooling hybrid investment in Thailand.

What not to do with it

Use the linked report for interpretation and keep basis differences explicit.

Related figures

Adjacent numbers that add context without drowning the value.

Report context

Atlas actors in this figure's reports

Profiles covered in the report that cite this number.

Per-0.1 PUE TCO saving Β· Insight