SPP auction allocations 2022-2024
~5GW
Capacity ERC awarded through 2022-2024 SPP renewable auctions (solar, wind, hybrid). Commercial Operation Dates 2025-2028.
Figure in context
Capacity ERC awarded through 2022-2024 SPP renewable auctions (solar, wind, hybrid). Commercial Operation Dates 2025-2028.
Capacity ERC awarded through 2022-2024 SPP renewable auctions (solar, wind, hybrid). Commercial Operation Dates 2025-2028.
Time scope
2022-2024
Source basis
Primary source
Interpretation notes
What this tells you
Capacity ERC awarded through 2022-2024 SPP renewable auctions (solar, wind, hybrid). Commercial Operation Dates 2025-2028.
What not to do with it
Use the linked report for interpretation and keep basis differences explicit.
Related figures
Adjacent numbers that add context without drowning the value.
Thailand installed power capacity
EPPO, IRENA
PDP 2024 renewable target (2037)
EPPO PDP 2024
Gulf Energy FY2024 revenue
Gulf Energy FY2024 Form 56-1
Carbon neutrality target
Ministry of Natural Resources and Environment
B.Grimm Power installed capacity
B.Grimm Power FY2024 Form 56-1
UGT corporate-PPA launch
ERC, MEA, PEA
Report context
Atlas actors in this figure's reports
Profiles covered in the report that cite this number.