Reference
Β·Primary source
Thailand installed power capacity
~55GW
Thailand installed power generation capacity at end-2024 per EPPO. Natural gas ~52% of mix; renewables ~30% of installed capacity.
Figure in context
Thailand installed power generation capacity at end-2024 per EPPO. Natural gas ~52% of mix; renewables ~30% of installed capacity.
Thailand installed power generation capacity at end-2024 per EPPO. Natural gas ~52% of mix; renewables ~30% of installed capacity.
Time scope
FY2024
Source basis
Primary source
Interpretation notes
What this tells you
Thailand installed power generation capacity at end-2024 per EPPO. Natural gas ~52% of mix; renewables ~30% of installed capacity.
What not to do with it
Use the linked report for interpretation and keep basis differences explicit.
Related figures
Adjacent numbers that add context without drowning the value.
PDP 2024 renewable target (2037)
EPPO PDP 2024
SPP auction allocations 2022-2024
Energy Regulatory Commission
Gulf Energy FY2024 revenue
Gulf Energy FY2024 Form 56-1
Carbon neutrality target
Ministry of Natural Resources and Environment
B.Grimm Power installed capacity
B.Grimm Power FY2024 Form 56-1
UGT corporate-PPA launch
ERC, MEA, PEA
Report context
Atlas actors in this figure's reports
Profiles covered in the report that cite this number.