Reference
·Supporting source
Thailand CCUS Levelised Capture-and-Storage Cost per Tonne
USD 55-110 per tonne CO2
Levelised CCUS capture-and-storage cost ranges from approximately USD 55-110 per tonne CO2 depending on source concentration. Natural-gas processing high-CO2 streams sit at the low end (USD 35-55), refinery hydrogen-plant flue gas at USD 65-85, cement clinker at USD 80-110, and petrochemical steam-cracker furnace flue gas at the upper end. CCS-VER stacking on T-VER with ICVCM CCP label can offset USD 25-45 per tonne in voluntary credit revenue.
Figure in context
Levelised CCUS capture-and-storage cost ranges from approximately USD 55-110 per tonne CO2 depending on source concentration. Natural-gas processing high-CO2 streams sit at the low end (USD 35-55), refinery hydrogen-plant flue gas at USD 65-85, cement clinker at USD 80-110, and petrochemical steam-cracker furnace flue gas at the upper end. CCS-VER stacking on T-VER with ICVCM CCP label can offset USD 25-45 per tonne in voluntary credit revenue.
Levelised CCUS capture-and-storage cost ranges from approximately USD 55-110 per tonne CO2 depending on source concentration. Natural-gas processing high-CO2 streams sit at the low end (USD 35-55), refinery hydrogen-plant flue gas at USD 65-85, cement clinker at USD 80-110, and petrochemical steam-cracker furnace flue gas at the upper end. CCS-VER stacking on T-VER with ICVCM CCP label can offset USD 25-45 per tonne in voluntary credit revenue.
Time scope
2027 build-out
Source basis
Supporting source
Interpretation notes
What this tells you
Levelised CCUS capture-and-storage cost ranges from approximately USD 55-110 per tonne CO2 depending on source concentration. Natural-gas processing high-CO2 streams sit at the low end (USD 35-55), refinery hydrogen-plant flue gas at USD 65-85, cement clinker at USD 80-110, and petrochemical steam-cracker furnace flue gas at the upper end. CCS-VER stacking on T-VER with ICVCM CCP label can offset USD 25-45 per tonne in voluntary credit revenue.
What not to do with it
Use the linked report for interpretation and keep basis differences explicit.
Related figures
Adjacent numbers that add context without drowning the value.
Thailand CCUS Operating Market Revenue (2027E)
PTTEP disclosures, BOI Section 8 CCUS package, Global CCS Institute Thailand chapter 2025, Insight Research triangulation
Thailand CO2 Captured and Stored Volume (2027E)
PTTEP Arthit feasibility, SCG and PTTGC sustainability reports, Bangchak FY2024 disclosures
Gulf of Thailand Offshore CCUS Storage Capacity (Arthit, Erawan, Bongkot)
PTTEP Q2 2025 CCS feasibility study, Global CCS Institute Thailand chapter
EU CBAM Phase 2 Effective Penalty on Thai Hard-to-Abate Exports
European Commission DG TAXUD CBAM Phase 2 regulation, HM Treasury UK CBA factsheet, ASEAN Centre for Energy ICA Phase 1 roadmap
PTTEP CCS Hub Share of Thai CCUS Revenue (2027E)
PTTEP corporate disclosures, JOGMEC trilateral MOU release, Insight Research operator triangulation
Thailand CCUS Green and Transition Bond Financing (2026-2027)
EXIM Bank Thailand sustainability disclosures, ADB Thailand Just Transition project page, Bank of Thailand thematic bond statistics
Report context
Atlas actors in this figure's reports
Profiles covered in the report that cite this number.