PDP2024 Behind-the-Meter Commercial PV Allocation (Through 2037)
~5-7 GW behind-the-meter PV through 2037
Thailand PDP2024 allocates 30 GW of solar PV and 8 GW of battery storage capacity through 2037. Of this, 5-7 GW is the behind-the-meter commercial PV slice, of which solar carport with EV charging and BESS is the highest-IRR sub-segment as rooftop solar saturates the available roofs at logistics hubs, factories, malls, and airports.
Figure in context
Thailand PDP2024 allocates 30 GW of solar PV and 8 GW of battery storage capacity through 2037. Of this, 5-7 GW is the behind-the-meter commercial PV slice, of which solar carport with EV charging and BESS is the highest-IRR sub-segment as rooftop solar saturates the available roofs at logistics hubs, factories, malls, and airports.
Thailand PDP2024 allocates 30 GW of solar PV and 8 GW of battery storage capacity through 2037. Of this, 5-7 GW is the behind-the-meter commercial PV slice, of which solar carport with EV charging and BESS is the highest-IRR sub-segment as rooftop solar saturates the available roofs at logistics hubs, factories, malls, and airports.
Time scope
2037E
Source basis
Primary source
Interpretation notes
What this tells you
Thailand PDP2024 allocates 30 GW of solar PV and 8 GW of battery storage capacity through 2037. Of this, 5-7 GW is the behind-the-meter commercial PV slice, of which solar carport with EV charging and BESS is the highest-IRR sub-segment as rooftop solar saturates the available roofs at logistics hubs, factories, malls, and airports.
What not to do with it
Use the linked report for interpretation and keep basis differences explicit.
Related figures
Adjacent numbers that add context without drowning the value.
Thailand Solar Carport plus Microgrid Installed Capex (2027E)
PDP2024, BOI announcement 4/2568, SCB EIC outlook, operator triangulation
Thailand Cumulative EV Registrations (End-2027E)
EVAT EV registration bulletin 2025, DLT registration database, EGAT EV demand model
Solar Carport plus BESS Commercial Demand-Charge Reduction (Pilot Average)
EGAT grid-resilience pilot report 2025, MEA distributed-generation framework
Thailand Solar Carport Plus Storage LCOE (2027E)
SCB EIC LCOE benchmarks, IRENA Thailand distributed PV, operator EPC quotes
Solar Carport Project IRR With T-VER Carbon Stacking (2027E)
TGO T-VER PL-2/2568, BCRC market data, SCB EIC project IRR model
Captive Microgrid Anchor-Tenant PPA Tenor (2026-2027)
Operator disclosures, Amata FY2024 annual report, Frasers Property Thailand FY2024
Report context
Atlas actors in this figure's reports
Profiles covered in the report that cite this number.