EGAT estimated share of 2027 Thai floating-solar operating capacity

~50%

As ofFY2027 modelled·Sources2·Supporting

EGAT direct build (Sirindhorn, Ubol Ratana, Sirikit, Vajiralongkorn, plus Phase 2 sites) projected to take roughly 50 percent of 2027 operating capacity. Gulf Energy Development, Banpu, B.Grimm Power, Energy Absolute, PTTOR, plus mid-tier IPP and EPC contractors share the remainder.

Compare plans →

Figure in context

EGAT direct build (Sirindhorn, Ubol Ratana, Sirikit, Vajiralongkorn, plus Phase 2 sites) projected to take roughly 50 percent of 2027 operating capacity. Gulf Energy Development, Banpu, B.Grimm Power, Energy Absolute, PTTOR, plus mid-tier IPP and EPC contractors share the remainder.

EGAT direct build (Sirindhorn, Ubol Ratana, Sirikit, Vajiralongkorn, plus Phase 2 sites) projected to take roughly 50 percent of 2027 operating capacity. Gulf Energy Development, Banpu, B.Grimm Power, Energy Absolute, PTTOR, plus mid-tier IPP and EPC contractors share the remainder.

Time scope

FY2027 modelled

Source basis

Supporting source

Interpretation notes

What this tells you

EGAT direct build (Sirindhorn, Ubol Ratana, Sirikit, Vajiralongkorn, plus Phase 2 sites) projected to take roughly 50 percent of 2027 operating capacity. Gulf Energy Development, Banpu, B.Grimm Power, Energy Absolute, PTTOR, plus mid-tier IPP and EPC contractors share the remainder.

What not to do with it

Use the linked report for interpretation and keep basis differences explicit.

Related figures

Adjacent numbers that add context without drowning the value.

Report context

Atlas actors in this figure's reports

Profiles covered in the report that cite this number.

EGAT estimated share of 2027 Thai floating-solar operating capacity · Insight