Reference
Β·Primary source
ERC Hybrid Tariff Feed-in-Premium (blended)
THB 2.16-2.34 per kWh
ERC Hybrid Hydro-Solar Tariff Pricing Order (Q1 2026) sets blended Feed-in-Premium at THB 2.16-2.34 per kWh for EGAT reservoir hybrid projects; covers daytime solar dispatch plus evening hydro firming. Establishes the 2027 demand-side anchor for EGAT Phase 2 and Phase 3 sites.
Figure in context
ERC Hybrid Hydro-Solar Tariff Pricing Order (Q1 2026) sets blended Feed-in-Premium at THB 2.16-2.34 per kWh for EGAT reservoir hybrid projects; covers daytime solar dispatch plus evening hydro firming. Establishes the 2027 demand-side anchor for EGAT Phase 2 and Phase 3 sites.
ERC Hybrid Hydro-Solar Tariff Pricing Order (Q1 2026) sets blended Feed-in-Premium at THB 2.16-2.34 per kWh for EGAT reservoir hybrid projects; covers daytime solar dispatch plus evening hydro firming. Establishes the 2027 demand-side anchor for EGAT Phase 2 and Phase 3 sites.
Time scope
ERC Pricing Order 2026
Source basis
Primary source
Interpretation notes
What this tells you
ERC Hybrid Hydro-Solar Tariff Pricing Order (Q1 2026) sets blended Feed-in-Premium at THB 2.16-2.34 per kWh for EGAT reservoir hybrid projects; covers daytime solar dispatch plus evening hydro firming. Establishes the 2027 demand-side anchor for EGAT Phase 2 and Phase 3 sites.
What not to do with it
Use the linked report for interpretation and keep basis differences explicit.
Related figures
Adjacent numbers that add context without drowning the value.
Thailand floating-solar operating capacity (2024 baseline)
EGAT, IRENA Thailand country note
Thailand floating-solar operating capacity (2027 base case)
EGAT phase 2 and 3 pipeline, BOI Section 8 promoted projects, operator filings
PDP2024 floating-solar target by 2037
EPPO PDP2024 issuance, EGAT Phase 2 and Phase 3 pipeline
EGAT estimated share of 2027 Thai floating-solar operating capacity
EGAT, SET-listed operator filings
Hybrid hydro-solar LCOE compression versus standalone solar
EGAT, EPC tender summaries, IRENA Thailand country note
T-VER plus I-REC stacking IRR uplift
TGO guidance, project IRR triangulation
Report context
Atlas actors in this figure's reports
Profiles covered in the report that cite this number.