Thailand datacenter operating IT load (2027 base case)

~800-1100 MW

As ofFY2027 modelled·Sources3·Supporting

Modelled 2027 operating IT load combining AWS Bangkok phase 2, Google Cloud Bangkok ramp, Microsoft Azure Bangkok phase 1, True IDC East Bangna 3, NTT Bangkok 3, ST Telemedia, GULF Edge Equinix JV, and Bridge Data Centres BKK1. Implies a 3.3-4.6x lift versus 2024.

Figure in context

Modelled 2027 operating IT load combining AWS Bangkok phase 2, Google Cloud Bangkok ramp, Microsoft Azure Bangkok phase 1, True IDC East Bangna 3, NTT Bangkok 3, ST Telemedia, GULF Edge Equinix JV, and Bridge Data Centres BKK1. Implies a 3.3-4.6x lift versus 2024.

Modelled 2027 operating IT load combining AWS Bangkok phase 2, Google Cloud Bangkok ramp, Microsoft Azure Bangkok phase 1, True IDC East Bangna 3, NTT Bangkok 3, ST Telemedia, GULF Edge Equinix JV, and Bridge Data Centres BKK1. Implies a 3.3-4.6x lift versus 2024.

Time scope

FY2027 modelled

Source basis

Supporting source

Interpretation notes

What this tells you

Modelled 2027 operating IT load combining AWS Bangkok phase 2, Google Cloud Bangkok ramp, Microsoft Azure Bangkok phase 1, True IDC East Bangna 3, NTT Bangkok 3, ST Telemedia, GULF Edge Equinix JV, and Bridge Data Centres BKK1. Implies a 3.3-4.6x lift versus 2024.

What not to do with it

Use the linked report for interpretation and keep basis differences explicit.

Related figures

Adjacent numbers that add context without drowning the value.

Report context

Atlas actors in this figure's reports

Profiles covered in the report that cite this number.

Thailand datacenter operating IT load (2027 base case) · Insight