EGAT Floating Solar Phase 2 plus Phase 3 pipeline under FID

1,440 MW

As of2024-2025 announcementsΒ·Sources1Β·Primary

EGAT Floating Solar Phase 2 plus Phase 3 covers Sirikit (340 MW), Vajiralongkorn (250 MW), Bhumibol (158 MW), Khun Dan Prakan Chon (95 MW), Lam Ta Khong (24 MW), Kaeng Krachan (24 MW), plus Phase 3 reservoirs at Srinakarin and Rajjaprabha totalling 1,440 MW under FID for commissioning 2026 through 2030.

Figure in context

EGAT Floating Solar Phase 2 plus Phase 3 covers Sirikit (340 MW), Vajiralongkorn (250 MW), Bhumibol (158 MW), Khun Dan Prakan Chon (95 MW), Lam Ta Khong (24 MW), Kaeng Krachan (24 MW), plus Phase 3 reservoirs at Srinakarin and Rajjaprabha totalling 1,440 MW under FID for commissioning 2026 through 2030.

EGAT Floating Solar Phase 2 plus Phase 3 covers Sirikit (340 MW), Vajiralongkorn (250 MW), Bhumibol (158 MW), Khun Dan Prakan Chon (95 MW), Lam Ta Khong (24 MW), Kaeng Krachan (24 MW), plus Phase 3 reservoirs at Srinakarin and Rajjaprabha totalling 1,440 MW under FID for commissioning 2026 through 2030.

Time scope

2024-2025 announcements

Source basis

Primary source

Interpretation notes

What this tells you

EGAT Floating Solar Phase 2 plus Phase 3 covers Sirikit (340 MW), Vajiralongkorn (250 MW), Bhumibol (158 MW), Khun Dan Prakan Chon (95 MW), Lam Ta Khong (24 MW), Kaeng Krachan (24 MW), plus Phase 3 reservoirs at Srinakarin and Rajjaprabha totalling 1,440 MW under FID for commissioning 2026 through 2030.

What not to do with it

Use the linked report for interpretation and keep basis differences explicit.

Related figures

Adjacent numbers that add context without drowning the value.

Report context

Atlas actors in this figure's reports

Profiles covered in the report that cite this number.

EGAT Floating Solar Phase 2 plus Phase 3 pipeline under FID Β· Insight