Thailand LNG terminal regasification capacity (ranked)

~19 Mtpa total (2024)

As of2024·Sources1·Primary·Historical series (3 points)

Thailand's installed onshore LNG regasification capacity totalled approximately 19 million tonnes per annum (Mtpa) at end-2024, concentrated at Map Ta Phut on the Eastern Seaboard. PTT LNG's Map Ta Phut Terminal 1 (commissioned 2011) provides 11.5 Mtpa after a Phase 2 expansion. The Nong Fab (Map Ta Phut Phase 2 / LNG Receiving Terminal 2) commissioned in 2022 adds 7.5 Mtpa. Gulf Energy Development together with PTT is progressing an additional ~5 Mtpa Map Ta Phut Phase 3 floating storage and regasification unit (FSRU) targeted for the late 2020s, which would lift national capacity to roughly 24 Mtpa. The single-location concentration creates a structural resilience risk.

Figure in context

Thailand's installed onshore LNG regasification capacity totalled approximately 19 million tonnes per annum (Mtpa) at end-2024, concentrated at Map Ta Phut on the Eastern Seaboard. PTT LNG's Map Ta Phut Terminal 1 (commissioned 2011) provides 11.5 Mtpa after a Phase 2 expansion. The Nong Fab (Map Ta Phut Phase 2 / LNG Receiving Terminal 2) commissioned in 2022 adds 7.5 Mtpa. Gulf Energy Development together with PTT is progressing an additional ~5 Mtpa Map Ta Phut Phase 3 floating storage and regasification unit (FSRU) targeted for the late 2020s, which would lift national capacity to roughly 24 Mtpa. The single-location concentration creates a structural resilience risk.

Map Ta Phut T1 (PTT LN…Map Ta Phut T1 (PTT LNG)11.5Nong Fab / MTP T2 (PTT…Nong Fab / MTP T2 (PTT LNG)7.5Map Ta Phut T3 FSRU (p…Map Ta Phut T3 FSRU (planned)5
Interpretation notes

What this tells you

Thailand's installed onshore LNG regasification capacity totalled approximately 19 million tonnes per annum (Mtpa) at end-2024, concentrated at Map Ta Phut on the Eastern Seaboard. PTT LNG's Map Ta Phut Terminal 1 (commissioned 2011) provides 11.5 Mtpa after a Phase 2 expansion. The Nong Fab (Map Ta Phut Phase 2 / LNG Receiving Terminal 2) commissioned in 2022 adds 7.5 Mtpa. Gulf Energy Development together with PTT is progressing an additional ~5 Mtpa Map Ta Phut Phase 3 floating storage and regasification unit (FSRU) targeted for the late 2020s, which would lift national capacity to roughly 24 Mtpa. The single-location concentration creates a structural resilience risk.

What not to do with it

Values in Mtpa (million tonnes per annum). T3 is under development, expected commercial operations late 2020s.

Related figures

Adjacent numbers that add context without drowning the value.

Report context

Atlas actors in this figure's reports

Profiles covered in the report that cite this number.

Thailand LNG terminal regasification capacity (ranked) · Insight