Reference
·Primary source
Thailand cement output baseline (2024)
~36 Mt
Combined 2024 Thai cement output across SCG (~24 Mt), INSEE Cement Thailand (~8 Mt), and TPI Polene (~4 Mt). Domestic demand plus regional export base.
Figure in context
Combined 2024 Thai cement output across SCG (~24 Mt), INSEE Cement Thailand (~8 Mt), and TPI Polene (~4 Mt). Domestic demand plus regional export base.
Combined 2024 Thai cement output across SCG (~24 Mt), INSEE Cement Thailand (~8 Mt), and TPI Polene (~4 Mt). Domestic demand plus regional export base.
Time scope
FY2024
Source basis
Primary source
Interpretation notes
What this tells you
Combined 2024 Thai cement output across SCG (~24 Mt), INSEE Cement Thailand (~8 Mt), and TPI Polene (~4 Mt). Domestic demand plus regional export base.
What not to do with it
Use the linked report for interpretation and keep basis differences explicit.
Related figures
Adjacent numbers that add context without drowning the value.
Thailand cement carbon intensity (2024)
GCCA GNR Thailand, operator sustainability reports
Thai LC3 and low-carbon cement output (2024)
Operator product disclosures, SCG Eco SCG, TGO T-VER projects
Thai low-carbon cement output (2027 base case)
Operator disclosures, BOI Section 8 pipeline, GCCA roadmap
LC3 cement intensity target band (2027)
EPFL LC3, GCCA GNR, SCG and INSEE roadmap
CBAM cost shock on Thai cement exports (2026)
EU CBAM portal, UK HM Treasury CBA factsheet
TPI Polene thermal substitution rate target (2027)
TPI Polene sustainability disclosure, TGO T-VER project filings
Report context
Atlas actors in this figure's reports
Profiles covered in the report that cite this number.