~0.4-1.1 Mt
2024 estimated output of LC3 (calcined clay limestone clinker) and blended low-carbon cement variants in Thailand. Early pilot phase before SCG and INSEE Saraburi commissioning.
Figure in context
2024 estimated output of LC3 (calcined clay limestone clinker) and blended low-carbon cement variants in Thailand. Early pilot phase before SCG and INSEE Saraburi commissioning.
2024 estimated output of LC3 (calcined clay limestone clinker) and blended low-carbon cement variants in Thailand. Early pilot phase before SCG and INSEE Saraburi commissioning.
Time scope
FY2024
Source basis
Supporting source
Interpretation notes
What this tells you
2024 estimated output of LC3 (calcined clay limestone clinker) and blended low-carbon cement variants in Thailand. Early pilot phase before SCG and INSEE Saraburi commissioning.
What not to do with it
Use the linked report for interpretation and keep basis differences explicit.
Related figures
Adjacent numbers that add context without drowning the value.
Thailand cement output baseline (2024)
SCG, SCCC, TPIPL annual disclosures, GCCA GNR
Thailand cement carbon intensity (2024)
GCCA GNR Thailand, operator sustainability reports
Thai low-carbon cement output (2027 base case)
Operator disclosures, BOI Section 8 pipeline, GCCA roadmap
LC3 cement intensity target band (2027)
EPFL LC3, GCCA GNR, SCG and INSEE roadmap
CBAM cost shock on Thai cement exports (2026)
EU CBAM portal, UK HM Treasury CBA factsheet
TPI Polene thermal substitution rate target (2027)
TPI Polene sustainability disclosure, TGO T-VER project filings