Reference
·Supporting source
·PreviewLC3 cement intensity target band (2027)
~380-485 kgCO2/t
Target intensity band for LC3 (limestone calcined clay clinker) cement in Thailand by 2027, equivalent to a 30-45 percent reduction versus the 685 kgCO2/t baseline.
Figure in context
Target intensity band for LC3 (limestone calcined clay clinker) cement in Thailand by 2027, equivalent to a 30-45 percent reduction versus the 685 kgCO2/t baseline.
Target intensity band for LC3 (limestone calcined clay clinker) cement in Thailand by 2027, equivalent to a 30-45 percent reduction versus the 685 kgCO2/t baseline.
Time scope
FY2027 target
Source basis
Supporting source
Interpretation notes
What this tells you
Target intensity band for LC3 (limestone calcined clay clinker) cement in Thailand by 2027, equivalent to a 30-45 percent reduction versus the 685 kgCO2/t baseline.
What not to do with it
Use the linked report for interpretation and keep basis differences explicit.
Related figures
Adjacent numbers that add context without drowning the value.
Thailand cement output baseline (2024)
SCG, SCCC, TPIPL annual disclosures, GCCA GNR
Thailand cement carbon intensity (2024)
GCCA GNR Thailand, operator sustainability reports
Thai LC3 and low-carbon cement output (2024)
Operator product disclosures, SCG Eco SCG, TGO T-VER projects
Thai low-carbon cement output (2027 base case)
Operator disclosures, BOI Section 8 pipeline, GCCA roadmap
CBAM cost shock on Thai cement exports (2026)
EU CBAM portal, UK HM Treasury CBA factsheet
TPI Polene thermal substitution rate target (2027)
TPI Polene sustainability disclosure, TGO T-VER project filings
Report context
Atlas actors in this figure's reports
Profiles covered in the report that cite this number.