Reference

·

Primary source

EA Amita lithium-ion installed capacity (2023-2025)

1-2 GWh (phase-1)

As of2023-2025 (commissioned and expansion)·Sources4·Primary·Historical series (5 points)

Energy Absolute (SET:EA) operates the Amita Technology Thailand pouch-cell gigafactory in Chachoengsao with a phase-1 installed capacity of 1 GWh per year, commissioned in 2021. The facility is expanding toward 2 GWh of installed capacity in 2024-2025, with stated potential to reach 4 GWh on the existing footprint and a longer-horizon ambition of 50 GWh announced as ASEAN's largest battery factory. The 90-rai EEC site hosts more than 80,000 sqm of production area. Cells supply EA's MINE Mobility electric-bus and electric-boat fleet plus its grid-storage portfolio. Commissioning timing has been subject to revision amid global lithium supply-chain pressures.

Figure in context

Energy Absolute (SET:EA) operates the Amita Technology Thailand pouch-cell gigafactory in Chachoengsao with a phase-1 installed capacity of 1 GWh per year, commissioned in 2021. The facility is expanding toward 2 GWh of installed capacity in 2024-2025, with stated potential to reach 4 GWh on the existing footprint and a longer-horizon ambition of 50 GWh announced as ASEAN's largest battery factory. The 90-rai EEC site hosts more than 80,000 sqm of production area. Cells supply EA's MINE Mobility electric-bus and electric-boat fleet plus its grid-storage portfolio. Commissioning timing has been subject to revision amid global lithium supply-chain pressures.

1.0020211.0020221.0020231.5020242.002025E
Interpretation notes

What this tells you

Energy Absolute (SET:EA) operates the Amita Technology Thailand pouch-cell gigafactory in Chachoengsao with a phase-1 installed capacity of 1 GWh per year, commissioned in 2021. The facility is expanding toward 2 GWh of installed capacity in 2024-2025, with stated potential to reach 4 GWh on the existing footprint and a longer-horizon ambition of 50 GWh announced as ASEAN's largest battery factory. The 90-rai EEC site hosts more than 80,000 sqm of production area. Cells supply EA's MINE Mobility electric-bus and electric-boat fleet plus its grid-storage portfolio. Commissioning timing has been subject to revision amid global lithium supply-chain pressures.

What not to do with it

Values in GWh installed capacity. Step-up reflects phase-1 expansion; longer-horizon 4 GWh target requires additional capex commitment.

Related figures

Adjacent numbers that add context without drowning the value.

Report context

Atlas actors in this figure's reports

Profiles covered in the report that cite this number.

EA Amita lithium-ion installed capacity (2023-2025) · Insight