PDP 2024 grid-scale BESS capacity target (2025-2037)

~10.5-14 GW by 2037

As of2025-2037 (PDP 2024)·Sources4·Primary·Historical series (5 points)

Thailand's Power Development Plan (PDP) 2024 sets a battery energy storage system (BESS) target of approximately 10.5-14 GW by 2037, alongside the 50 GW renewable-capacity goal. EGAT's near-term roadmap targets ~0.5-1 GW by 2026, ramping through the late 2020s as solar and wind penetration rises. Ember's cost-optimal pathway analysis (September 2025) recommends an additional 6 GW / 15 GWh of battery storage beyond the PDP target to capture USD 1.8 billion in 2026-2037 cost savings. Procurement is led by EGAT directly plus IPPs required to pair storage with new solar PPA awards, with CATL, BYD, Fluence, and Tesla Megapack competing for tenders.

Figure in context

Thailand's Power Development Plan (PDP) 2024 sets a battery energy storage system (BESS) target of approximately 10.5-14 GW by 2037, alongside the 50 GW renewable-capacity goal. EGAT's near-term roadmap targets ~0.5-1 GW by 2026, ramping through the late 2020s as solar and wind penetration rises. Ember's cost-optimal pathway analysis (September 2025) recommends an additional 6 GW / 15 GWh of battery storage beyond the PDP target to capture USD 1.8 billion in 2026-2037 cost savings. Procurement is led by EGAT directly plus IPPs required to pair storage with new solar PPA awards, with CATL, BYD, Fluence, and Tesla Megapack competing for tenders.

0.3020251.0020273.5020307.00203312.52037
Interpretation notes

What this tells you

Thailand's Power Development Plan (PDP) 2024 sets a battery energy storage system (BESS) target of approximately 10.5-14 GW by 2037, alongside the 50 GW renewable-capacity goal. EGAT's near-term roadmap targets ~0.5-1 GW by 2026, ramping through the late 2020s as solar and wind penetration rises. Ember's cost-optimal pathway analysis (September 2025) recommends an additional 6 GW / 15 GWh of battery storage beyond the PDP target to capture USD 1.8 billion in 2026-2037 cost savings. Procurement is led by EGAT directly plus IPPs required to pair storage with new solar PPA awards, with CATL, BYD, Fluence, and Tesla Megapack competing for tenders.

What not to do with it

Values in GW grid-scale BESS capacity. 2037 endpoint is the PDP 2024 mid-case (10.5-14 GW range).

Related figures

Adjacent numbers that add context without drowning the value.

Report context

Atlas actors in this figure's reports

Profiles covered in the report that cite this number.

PDP 2024 grid-scale BESS capacity target (2025-2037) · Insight