PDP 2024 grid-scale BESS capacity target (2025-2037)
~10.5-14 GW by 2037
Thailand's Power Development Plan (PDP) 2024 sets a battery energy storage system (BESS) target of approximately 10.5-14 GW by 2037, alongside the 50 GW renewable-capacity goal. EGAT's near-term roadmap targets ~0.5-1 GW by 2026, ramping through the late 2020s as solar and wind penetration rises. Ember's cost-optimal pathway analysis (September 2025) recommends an additional 6 GW / 15 GWh of battery storage beyond the PDP target to capture USD 1.8 billion in 2026-2037 cost savings. Procurement is led by EGAT directly plus IPPs required to pair storage with new solar PPA awards, with CATL, BYD, Fluence, and Tesla Megapack competing for tenders.
Figure in context
Thailand's Power Development Plan (PDP) 2024 sets a battery energy storage system (BESS) target of approximately 10.5-14 GW by 2037, alongside the 50 GW renewable-capacity goal. EGAT's near-term roadmap targets ~0.5-1 GW by 2026, ramping through the late 2020s as solar and wind penetration rises. Ember's cost-optimal pathway analysis (September 2025) recommends an additional 6 GW / 15 GWh of battery storage beyond the PDP target to capture USD 1.8 billion in 2026-2037 cost savings. Procurement is led by EGAT directly plus IPPs required to pair storage with new solar PPA awards, with CATL, BYD, Fluence, and Tesla Megapack competing for tenders.
Interpretation notes
What this tells you
Thailand's Power Development Plan (PDP) 2024 sets a battery energy storage system (BESS) target of approximately 10.5-14 GW by 2037, alongside the 50 GW renewable-capacity goal. EGAT's near-term roadmap targets ~0.5-1 GW by 2026, ramping through the late 2020s as solar and wind penetration rises. Ember's cost-optimal pathway analysis (September 2025) recommends an additional 6 GW / 15 GWh of battery storage beyond the PDP target to capture USD 1.8 billion in 2026-2037 cost savings. Procurement is led by EGAT directly plus IPPs required to pair storage with new solar PPA awards, with CATL, BYD, Fluence, and Tesla Megapack competing for tenders.
What not to do with it
Values in GW grid-scale BESS capacity. 2037 endpoint is the PDP 2024 mid-case (10.5-14 GW range).
Related figures
Adjacent numbers that add context without drowning the value.
EA Amita lithium-ion installed capacity (2023-2025)
Energy Absolute, Amita Technology Thailand corporate, MarkLines, APEC Energy Working Group documentation
BYD Rayong plant cumulative EV production (2024-2025)
BYD corporate announcements, Karmactive, CarNewsChina, Electrive.com, Thailand BOI EV3.5 disclosure
Phang Nga lithium-bearing ore reserve
Department of Primary Industries and Mines, Bangkok Post, Nation Thailand, Electrive.com
BNEF global lithium-ion battery pack price (2020-2025)
BloombergNEF Lithium-Ion Battery Pack Price Survey, Energy-Storage News, PV Magazine
Thailand EV battery local-content target
Thailand Board of Investment EV3.5 announcement, NXPO, EEC Office
GPSC G-Cell battery production capacity
GPSC annual report, GPSC G-Cell announcements, PTT Group strategy disclosures, 24M Technologies licensing
Report context
Atlas actors in this figure's reports
Profiles covered in the report that cite this number.